The engineering design mainly consists of three parts: feasibility study, preliminary design and construction drawing design.
After reaching an agreement with customer, we start to organize a working team for the engineering design, including: planning, investigation, data collection, planning and optimization, project evaluation, report writing, and form a formal report after exchanging views with customer.
The working team requires divisions and cooperation from different specialities as follow.
Collecting “Geological General Survey and Design”, “Geological Survey (detailed survey) Report” or “Reserve Verification Report” and the approved documents.
To Estimate the equipment quantity and specifications mine required by collecting mine information of lifting, transportation, pressure, drainage, etc. Providing scheme for equipments’ optimum utilization.
Information collection including geographic and topographic data, social economy, weather, flood, engineering geology and hydrology geology, traffic, environmental protection etc.
By the data collection and the feasibility study from the various professionals, a feasible plan for the plant construction would be finally made, and the “Feasibility Study Report ” shall be submitted to the relevant departments.
When the preliminary design is approved, The design team starts to make working drawings. When the working drawings completed, the designers must hand the drawings over to the construction officers, especially give instructions about construction details.